英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

The Cost of Buildings-建筑成本研究 [9]

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2014-06-13编辑:lzm点击率:20203

论文字数:7393论文编号:org201406132139297977语种:英语 English地区:中国价格:免费论文

关键词:Cost of Buildings建筑成本Material costs材料成本Doors and Windows

摘要:The building industry and the civil engineering industry together are often referred to as the construction industry, and many firms operate in both sectors, even though their staff and organizations may be largely separate.

(Calin, M 2003)

Fuel consumption can be closely monitored on the construction site. However, if this is not possible and no historical data exist, information from equipment manufacturers can be used for estimating. Fuel consumption depends on the application of the equipment. The application determines the engine load factor, which in turn controls engine fuel consumption. (Calin, M 2003)

Renting construction equipment is an increasingly popular procurement method.
Equipment rental rates do not include transportation costs, erecting and dismantling costs, insurance, or taxes. These costs must be determined and added to the rental costs in order to determine the total cost of acquiring equipment. (Calin, M 2003)


Chapter 6
MATERIAL COSTS
Materials can be judged in terms of their durability and freedom from the need for repair and maintenance.
The first part of an estimating task is to determine the amount of materials that will be required. Material quantities are the fundamental data forming the foundation on which all estimating processed build. This first step in determining the necessary amount of material is called quantity take off. ( Calin, M 2003)
Quantity take off is an extremely important task with direct implications for the many estimating tasks that follow it. The unit prices and the total prices of materials to procure, labor and equipment requirements and the scheduling of each activity are all based on the quantity take off. Therefore, it is clear that quantity take off is the foundation and the basis for all other estimating work and ultimately affects the total cost estimate of a project. Therefore, a quantity surveyor must be careful and through in her work in order to produce the most accurate calculations for the quantities of all the materials in the project. (Calin, M 2003)
1. Linear Calculation: perimeter of a Concrete Slab
60m +50m +60m +50m =220m
2. Area Calculation: Surface Area of Slab
60m ×50m =300m²
3. Volume Calculation: Volume of Slab
60m ×50m 0.01m = 30m³
4. Unit measurement Calculation: Number of Type “A” Windows on 1st Floor
2 (North Wall) +6 (East Wall) +4 (South Wall) +5 (West Wall) =17 units
Figure 5.1 Examples of the four categories of calculations involved in estimating.
The calculations involved in quantity take off can be categorized into four basic components: linear, area, volume, and unit measures. When performing quantity take off, a quantity surveyor should visualize the entire project, thinking in terms of actual field procedures that will take place during construction. Quantity take off is also facilitated by the use of forms associated with each construction division. The purpose of using form is to standardize the work sheets by providing property assigned areas where specific information is to be written, thus organizing information in such a way that follow up and checking can be easily performed. (Calin, M 2003)
In addition to the calculation quantities obtained from quantity take off, the actual material quantities required for a work may be higher due to waste. Waste factor is used to increase material quantity, so as to ensure that enough material is procured to realistically complete the work. (Calin, M 2003)
Waste factors are usually listed by a percentage of the actual q论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。