英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

The Cost of Buildings-建筑成本研究 [4]

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2014-06-13编辑:lzm点击率:20088

论文字数:7393论文编号:org201406132139297977语种:英语 English地区:中国价格:免费论文

关键词:Cost of Buildings建筑成本Material costs材料成本Doors and Windows

摘要:The building industry and the civil engineering industry together are often referred to as the construction industry, and many firms operate in both sectors, even though their staff and organizations may be largely separate.

determined. Many of the details relating to spot items will also need to be obtained on the site. A worked example of the measurement of demolition and alteration work is provided in Advanced Building Measurement. (Ivor, H. S 1999)

When visiting the site the quantity surveyor should also be on the look-out for any unusual items which affect cost, and which should accordingly be included in the billed description. A check in the type of soil and groundwater level comes into this category, unless the information is supplied by the architect, probably in the form of particulars from trial pits or boreholes excavated on the site. With landfill or brown field sites, it is also necessary to check on possible land contamination, with the likely consequential high cost of removing contaminated soil and remedial measures, including the extraction of landfill gases such as methane. (Ivor, H. S 1999)
Site preparation
The first building operation is normally the excavation of the topsoil for preservation over the whole area of the building and this usually forms the first excavation item in the Excavating and Filling section of the bill of quantities. Spreading soil on the site to make up levels is measured in m³, distinguishing between average thickness ≤ and ≥ 250. (Ivor, H. S 1999)
Excavation of Foundation Trenches
When measuring foundation trenches it is advisable to separate the trenched into external and internal walls. There the external wall foundation is of constant width and the site is level, its measurement presents no real difficulty with the length being obtained by the normal girthing method. Where the site is sloping and stepped foundations are introduced the process of measurement of the foundation trench excavation is more complex, since each length of trench will have to be dealt with separately. It is good policy to use a schedule for this purpose giving the lengths, levels, average depths within maximum depth ranges, and widths of trench for each section between steps. The sum of the length of all the individual sections will need to be checked against the total calculated length to avoid any possibility of error. (Ivor, H. S 1999)
After measuring the excavation for external wall foundations, the internal wall foundations will be taken, and this will often involve a number of varying lengths and widths of foundations, which are best collected together in waste and the drawing suitably marked as each length is extracted. (Ivor, H. S 1999)
Disposal of Excavated Material
The subsequent disposal of excavated material forms a separate billed item in m³, either of soil to be stored on site, used as filling to make up levels, filling to excavations, or to be removed off the site. (Ivor, H. S 1999)
Basement excavation is measured to the outside of foundation in m³ stating the maximum depth range. Working space allowance is measured in m² on the external face of the basement walls, there the face of the excavation is > 60 from the face of the tanking or protective walls. (Ivor, H. S 1999)
It is usual to take the basement excavation as disposal of excavated material off site in the first instance and to later adjust the filling to excavation where appropriate. (Ivor, H. S 1999)
Earthwork Support
Support to the side of excavation is measured in m² to trenches, pits, and the like, where >250 in depth, whether the support论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。