英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

项目管理硕士课程作业:Schedule Planning for Tiancheng Synthesis Building [3]

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2013-07-16编辑:cinq点击率:7852

论文字数:2679论文编号:org201307152010156850语种:英语 English地区:美国价格:$ 22

关键词:项目管理硕士论文课程论文

摘要:进度是工程管理领域的三个主要目标。一个项目的成功可以简单地定义为把工作做在时间和成本的限制。调度是用来确定项目总工期的过程时,事件和活动计划发生(AMP,2006)。

The relationships between each task and the cost of every task are made based on the historical engineering experience.

Part 2: Schedule Management & Control
3. Overview of Schedule Management Tools
3.1 Work Breakdown Structure (WBS)
Work breakdown structure (WBS) is a hierarchical representation of the work contents. It is proved to be efficient that using WBS to define and structure the project works. WBS for now is a common tool in project management as the Project Management Book of Knowledge (PMBOK) collected the word and redefined it. According PMBOK’s describe, WBS is a deliverable oriented hierarchical decomposition of the work to be executed by the project team (PMI, 2008). Through WBS, the project can be subdivided into smaller parts in order to let project managers or other workers clear about the components of the project. And also, it can make a great contribution to operate procedure standardization. 

The importance of Work Breakdown Structure has been acknowledged by both theoretical researchers and engineering practice personnel. First of all, tt is the basis for defining work packages which is the crucial work of project management preparation (Rad, 1999; Colenso, 2000). Garcia-Forniels et al. (2003) declared that the WBS is the most important tool for project management because it provides a basis for scheduling, planning, responsibility assignment, information management and control. Also, through the procedure of WBS, the construction project information can be collected by the computer. Thus the WBS is the fundamental of project informationize.

Being a kind of scientific methodology of project management, the process of decomposition lead by WBS is not arbitrary but according to a sequence of principles and standards. There are 3 most important pre-works need to complete before project managers initiate the WBS process. The first relates to the decomposition criteria, which reflect the facets of information by which the work is subdivided across the WBS hierarchy. The second is the sequencing of these criteria, which relates to the order in which the criteria are applied in the hierarchy. The third issue relates to the level of detail, which reflects the extent to which the entire work is decomposed. 

Meanwhile, there are another 3 principles should be followed:
1) Each hierarchy should be a complete reflection of the whole project.
2) Different hierarchy should have different standard when decomposition.
3) The amount of hierarchies should stay at a proper level that those tasks in the lowest hierarchy can be precisely evaluated. 

3.2 Gantt Chart
Gantt chart is invented by Henry Laurence Gantt in 1917. The form of Gantt chart is a kind of bar diagram. In the bar diagram, the horizontal axis represents for the duration and the vertical axis represents for those tasks in the project. The horizontal bar in the chart gives a visual image to readers to understand the condition of each task. The length of the horizontal bar can show how long the task should spend; the start and the end of the bar represent the time point of the task starts and ends. Gantt chart is composed by task duration, line of relationship attachment and time scale. 

Gantt chart is used widely in project management. According to the describe of Gantt chart which is stated before, the biggest论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。