英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

项目管理硕士课程作业:Schedule Planning for Tiancheng Synthesis Building

论文作者:www.51lunwen.org论文属性:课程作业 Coursework登出时间:2013-07-16编辑:cinq点击率:7823

论文字数:2679论文编号:org201307152010156850语种:英语 English地区:美国价格:$ 22

关键词:项目管理硕士论文课程论文

摘要:进度是工程管理领域的三个主要目标。一个项目的成功可以简单地定义为把工作做在时间和成本的限制。调度是用来确定项目总工期的过程时,事件和活动计划发生(AMP,2006)。

      Executive Summary
      进度是工程管理领域的三个主要目标。一个项目的成功可以简单地定义为把工作做在时间和成本的限制。调度是用来确定项目总工期的过程时,事件和活动计划发生(AMP,2006)。通过调度,管理人员可以明确识别的任务或事件在整个项目中最关键的部分。工程项目进度计划与控制是工程建设运营商非常重要(Sears等,2008)。组织绩效的进度,及时发现并调整实际进度与计划进度之间的差异,为项目经理,来实现基本的作品。
      然而,调度不是简单的识别事件中存在的项目或让那些系列任务或事件,以符合实际的进展。调度也是一种优化。一些安排是可行的执行,但他们不是最好的。计划的最终目标是发现为了保持最佳的平衡项目的质量,成本的具体计划,项目的时间和其他要求。这一系列的作品不能仅仅通过人们的判断是基于经验和直觉而非科学的推理完成。作为管理科学的一个重要,项目管理已经发展了许多有效的分析工具来解决这些问题之前。根据这些工具的使用,调度工作的结果可以看作是稳定的和正确的。
      Schedule is one of the three main objectives in project management field. A project’s success can be simply defined as to get the job done under the time and cost limitation. Scheduling is the process used to determine the overall project duration and when events and activities are planned to happen (AMP, 2006). Through scheduling, managers can make a clear identification about which tasks or events are the most crucial parts in the whole project. Engineering project progress scheduling and control are very important to the project construction operator (Sears etc., 2008). Organizing the performance progress schedule and timely identifying and adjusting the discrepancy between the practical progress and the scheduled progress are the basic works for the project managers to realize. 
      However, scheduling is not as simple as to identify which events exist in the project or let those series of tasks or events in order to match the practical progress. Scheduling is also a matter of optimization. Some arrangements which are feasible to executive, but they are not the best. The final target of scheduling is to find out a specific plan in order to keep the best balance of the project quality, cost, time and other requirements of the project. These series of works can not be completed only by people’s judgment which is based on experience or instinct but not scientific ratiocination. As an important of management science, project management has developed a lot of efficient analysis tools to solve those problems stated before. Depending on the usage of these tools, the result of scheduling works can be seen as stable and correct.
      该项目管理报告将主要集中在实际工程实践中显示的项目进度计划的重要性和过程,是项目实施的基础。项目的目标是一个综合建筑,由主楼和附楼,位于江苏省建设,中国人民共和国。为了制定目标项目的进度计划,一系列成熟的项目管理工具将被使用。首先,工作分解结构技术将被用于确定和规范的活动包括在项目。然后,网络图和甘特图将采用以识别关键路径和项目中的里程碑事件。最后,考虑保持时间和成本的平衡,这两个问题相关的交叉分析法。
      This report will mainly focus on the real engineering project practice to show the importance and process of project schedule planning, which is the fundamental of project implementation. The target project is the construction of a Synthesis Building which is consist of a main building and an attached building and located in Jiangsu Province, People’s Republic of China. In order to formulate a proper schedule plan for the target project, a sequence of mature project management tools will be used. First of all, work breakdown structure technique will be used to identify and standardize the events included in the project. And then, network diagram and Gantt chart will be adopted in order to identify the critical path and the mile stone events in the project. Finally, considering keeping the balance of time and cost, a cross-analysis related to those two issues will be used.

Part 1: Schedule Planning & Assumptions
1. Assumption Declaration
1.1 Project Description<论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

共 1/6 页首页上一页123456下一页尾页

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非