物流管理专业,land use & transport planning:物流设计报告 Servage River Bridge
论文作者:51lunwen论文属性:报告 Report登出时间:2009-05-21编辑:steelbeezxp点击率:7435
论文字数:1890论文编号:org200905210728118533语种:英语 English地区:澳大利亚价格:$ 22
关键词:物流管理专业land use & transport planning物流设计报告Servage River Bridge
物流管理专业,land use & transport planning:物流设计报告 Servage River Bridge
Introduction
This
essay will talk about the feasibility study for a new bridge crossing the Servage River. The Nephest Council has been presented with a development proposal for a high technology industrial park to be located in the south-west sector of the town, in the Council’s planning zone 3 . This will increase employment for the whole town, which is currently experiencing a mild recession and consequently the Council is very keen for the project to go ahead. We just try our best to use a critical assessment of the
methodology to the project. In order to give the project a help, the influence at the aspect of employment, traffic circulation, living environment of building the new bridge will be include in this
essay. At the first part, we will discuss something about the project. Such as the background of the bridge, what method is used when building the bridge. Also, we will give some predict of future situation of this bridge. Then we will talk about the case of single bridge. Exactly the second part, we will talk about the case of two bridge. The fourth part, it will be used to discuss and analysis the data that we have been collect. As the last part, we will offer discuss the advantages of building the new bridge.
论文题目:物流设计报告
论文语种:英文
论文详细要求:Instruction
论文代写
写作报酬:3800
您的研究方向:物流管理专业,land use & transport planning 科目
您的国家:澳大利亚
您的学校背景:SYDNEY U
要求字数:2500 words
论文用途:硕士课程论文 Master Course
补充要求和说明:按论文要求就可以了,是一个 report, 并需要EXCEL的数据分析。 需要references 因为要交电子版,所以一定不能有抄袭或侵权的内容。 需要 分开的 单独的word文档和 EXCEl的数据文档。论文结构以及各个部分的大概字数,请参照评分标准来衡量。需要5个左右的reference,不需要引用原文,最好是英文文献, report形式。
截止日期:5天
作业内容:
assignment 2: Servage River Bridge
This assignment is worth 25 per cent of the total grade in this subject
Assignment due date is 12:00 on 12/10/08.
Your consulting firm has been successful in winning a project from the Nephest Council to undertake a feasibility study for a new bridge crossing the Servage River. You have been given the task of predicting the likely traffic impacts and network wide benefits of constructing the bridge.
This assignment will count 25 per cent towards your final grade in this subject. The grade for the assignment will be based on the rigour of the underlying modelling and analysis, extent to which the broader issues identified in the brief are addressed and the quality of the final report (covering presentation, structure and English expression). Make sure that you explain your methodology so that it can be checked.
Project Brief:
The Nephest Council has been presented with a development proposal for a high technology industrial park to be located in the south-west sector of the town, in the Council’s planning zone 3 (see Figure 1). This will increase employment for the whole town, which is currently experiencing a mild recession and consequently the Council is very keen for the project to go ahead.
The Council is, however, concerned about the likely effect of the development on traffic circulation in the town. A particular concern is that the existing single bridge over the Servage River may provide poor access to the development for residents of the northern suburbs. Another consideration is that the development of a number of recreational facilities on the northern side of the town is likely to result in a continuation of the trend for people to want to live in the northern suburbs. This will magnify the problem of
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。