Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal
英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献
ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter
澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文
小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法
英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查
temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语
经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目
日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题
职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意
论文作者:www.51lunwen.org论文属性:报告 Report登出时间:2015-07-10编辑:felicia点击率:23656
论文字数:10025论文编号:org201505262344323986语种:英语 English地区:英国价格:免费论文
关键词:
摘要:这是一篇有关马其顿国家银行实习经历report,详细阐述了作者自马其顿银行实习收获。
Options for Meeting/Managing Rising Power Demand
Investments in power generation/increased power imports
In order to meet forecast increasing power demand, either investments in new power generation capacity or increased power imports will be required no matter how Bitola is supplied with fuel.
One candidate for investment in power generation is a new 200 MW Combined Heat and Power (CHP) plant to be constructed in Skopje.
A study carried out by the Japan Consulting Institute in 1999 suggested that a CHP project in Skopje would have a favorable economic rate of return. This study did not, however, compare the project with the alternative of increasing power imports. In addition, the assumed gas price in the study of US$85/tcm has increased to around US$150/tcm currently.
The Harza study (discussed above) argued that a CHP plant would enter the least cost expansion plan for the power sector. This relied, however, on there being limited capacity for power imports. Subsequently Macedonia and Bulgaria have reached agreement on construction of a new transmission interconnection between the two countries, and a project is now under implementation; thus the Harza assumption on power imports is no longer valid. In addition, gas prices have changed significantly since the Harza study was carried out in 2000.
Recognizing the need to update previous work, the Government of Macedonia has in 2004 commissioned a Skopje CHP Feasibility Study. This will explore the economic viability of the proposed CHP plant vis a vis power imports and the possibility of converting the Negotino (oil fired) plant to run on gas or imported coal. The study will assess whether there is an economic rationale for a CHP plant and, if so, when such a plant should be constructed.
The feasibility study should be completed by the end of the second quarter in 2004. Assuming that it supports the proposed CHP project (i.e. demonstrates that it would provide power at lower cost than alternatives) a number of actions would be required.
Given the Government of Macedonia's constrained financial resources, construction of the CHP plant would have to proceed as a private project, sponsored by a strategic investor and commercially financed. To this end, the Government of Macedonia should appoint an adviser to select an investor through appropriate / transparent procedures.
The adviser would draft gas supply, power and heat purchase contracts for the CHP plant, together with bidding documents for an international competitive tender. The adviser would work with the Government of Macedonia, providing support in carrying out the tender (issuing request for proposals, technical evaluations, financial evaluations, etc.). It is likely that this proce本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。