英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

Internship Report 范文 [14]

论文作者:www.51lunwen.org论文属性:报告 Report登出时间:2015-07-10编辑:felicia点击率:23654

论文字数:10025论文编号:org201505262344323986语种:英语 English地区:英国价格:免费论文

关键词:

摘要:这是一篇有关马其顿国家银行实习经历report,详细阐述了作者自马其顿银行实习收获。

s reason, the section starts by focusing on the power sector. Noting that energy intensity is high in Macedonia, the section proceeds by examining measures to reduce energy demand, as listed in Chapter 1 above (reducing power distribution losses, etc.).


Power Sector


Installed power generation capacity in Macedonia is 1450 MW, comprising approximately 60 percent thermal and 40 percent hydro plant.


The main thermal generation plant – “Bitola” – has three units each of 225 MW, commissioned starting in 1982 with planned retirement/rehabilitation from 2013. In addition to Bitola, there is a 120 MW lignite fired plant – “Oslomej” – due for retirement in 2013 and a 210 MW oil fired plant – “Negotino” – which, due to prohibitively high fuel costs, has been used very rarely since it was commissioned in 1978. There are also seven large hydro plants in Macedonia with combined capacity 480 MW, and a numberof small hydro plants with total capacity around 50 MW.


Forecast power demand and supply are presented in Table 2 above. On the supply side, the table assumes that there are no new additions to capacity and that plant (specifically Bitola and Oslomej) is retired at current planned dates. The table shows supply for two scenarios: the first scenario assumes that, whilst available, Negotino is not dispatched due to prohibitively high costs; the second scenario assumes that Negotino is dispatched, and is included to illustrate the extent of Macedonia's power import dependency (for example, whilst Macedonia's power imports in 2008 may be close to 30 percent, because it is cheaper to import power than to operate Negotino, it need only import under 15 percent).


The table shows that, absent investment in new capacity and new fuel sources, a capacity imbalance will emerge in the medium term, and that by 2013, should Bitola close, Macedonia would be almost wholly dependent on imported power.


It is unlikely, however, that this situation will ensue in reality, given the various investment options open to Macedonia, which include: opening new lignite seams in existing mines/new lignite mines and – later – rehabilitation of Bitola; investment in new gas fired capacity; and increased power imports.


These are now considered in turn, based on the assumption that the Government of Macedonia will aim to select the most economically beneficial investments from available alternatives.


Maintaining Current Capacity/Bitola


One key issue as regards power balance in Macedonia is fuel supply to the Bitola power plant. This plant currently consumes 6.5 million tones of lignite annually from the Suvodol mine, where remaining reserves in the upper seam are around 60 million ton (i.e. enough to fire Bitola for another nine years [to the end of the design life for the first unit of the plant]).


A study carried out for ESM by Harza in 2000 suggested that exploitation of deposits in the Suvodol lower seam (where reserves are estimated to be around 36 million tons), and from a new mine (“Brod Gneotino”, with estimated reserves of 43 Million tons), together with rehabilitation of Bitola from 论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。