n most of supporting systems bring all them under one system in an advance tech platform.
1.4 SAP 6.0 to SAP S4 Feasibility study.
The project on HEMAS FMCG, SAP 6.0 HANA upgrade intends further improvements in to the EPR that they operate at the moment and this system upgrade will managed by the global SAP Functional team and the handing over will happen to the Hemas Corporate IT. The creation of blue print copy will be done by this team and also hey will do the pilot run planning and monitoring at FMCG sector offices located in Colombo (Head Office), Dankotuwa (Factory and Walisara (Finish good warehouse).Hence upgrading ERP in Hemas FMCG will be driven by the experienced global SAP team which will be and also will be facilitated by Attune Lanka. Attune is the local consultant for SAP implementation and upgrades.
Attune has shown is positive track records in SAP related projects. The company is very experienced in SAP implementation which is attached to MAS group. Attune with its localized experience they support the implementation and upgrade tasks locally while connecting the procedures with the global consultants and the locally based end users.
The SAP S4 Project needs be sponsored with US $1.5 Mn and this is forecast base on number of operators involved in the Sri Lankan operations. The approximate costing was carried out based on similar projects which were carried out for different agency offices. The Hemas group will be funded the full project which will be repaid to the group by the FMCG sector in 5 years' time. This is possible as the Revenue growth % is at 20.2% for 2016 (Hemas Annual Report, 2016).
2.1 Statement of work (SOW)
Hemas FMCG sector SAP 6.0 HANA Upgrade to SAP S4 will have the following critical areas as per the Statement of work.
Scope of work
Upgrade of SAP ERP will bring in all the functions such as Demand Planning team, Material Requisition team, Procurement, Stores, Quality Assurance, Finance, Marketing and HR. Currently HR is not integrated within the ERP but with SAP S4 HANA the Hemas FMCG will be fully integrated.
Since the data is currently is the same platform the integration will not be complex and time consuming. Following will be the main functions which will enjoy the facilities of the system upgrade.
Demand Planning - Material planning
Procurement - OP (Purchase Ordering) process
Production - Production planning
Stores/ Warehouse - GRN (Goods Receive) and stock control
Quality Assurance - Quality check and release Raw material
Finance - General Ledger and Financial reporting
Marketing and distribution- Releasing the Finish goods to the market
Project duration/ Budget
The expected time for the upgrade is 6 months starting form upgrade, pilot run and handing over. This will include the initial test run as well as most critical go live phase. The total SAP S4 upgrade is spitted in to phases for the monitoring and control purpose.
The funds need to be allocated to manage the cost and expenses. Hence a budget is allocated separately which is USD 1.5 Mn.
Key deliverables of the project
The key goal is to successfully upgrade the SAP 6.0 HANA in to the SAP S4 HANA. Hemas FMCG Sector intends to integrate the Human Resource (HR) function al
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。