代写南非留学生作业-土木工程施工作业Civil engineering assignment south Africa
论文作者:英语论文网论文属性:作业 Assignment登出时间:2012-01-30编辑:kalila点击率:4546
论文字数:2254论文编号:org201201301338037004语种:英语 English地区:南非价格:免费论文
关键词:代写南非留学生作业土木工程作业south Africacivil engineering assignment
摘要:代写南非留学生作业-土木工程施工作业Civil engineering assignment south Africa
R代写南非留学生作业-土木工程施工作业Civil engineering
assignment south Africa-eview the thinking:
1.1 the soil can be loose in the engineering of what are the application? 1.2 the elevation of the design method to determine the there are several? They have why to distinguish? Try 1.3 of the factors influencing slope stability have? And why. 1.4 the wall supporting what form? 1.5 cement wall design should consider what factors? 1.6 precipitation method? What are those? The scope? What are those? 1.7 this flow the causes of sand and prevention measures? 1.8 the light well point equipment to include? 1.9 the light well point design including what content? Its design steps? 1.10 5 in the form of a single fight? For what turkmen excavation respectively? 1.11 describes the filled soil compaction effect of the main factors? 1.12 the filled soil compaction degree how evaluation? 1. The series: (1) the soil in the pine sex coefficient: (2) flow sand phenomenon: the permeability coefficient (3), (4) the hydrodynamic pressure: a headscarf slope coefficient: [6] compaction coefficient: [the best water soil: the stuff can be loose soil sex:
2. Pile foundation question
Review the thinking:
https://www.51lunwen.org/southafrica/ Prefabricated concrete pile of 2.1 production, operation, transportation and piled up what basic requirements? 2.2 what type of pile hammer? How to choose heavy hammer in engineering? 2.3 this method and piling quality control standards. 2.4 the piles of prefabricated piles method? What are those? 2.5 slurry supporting bored piles of mud has what function? Mud recycling what are two ways, its effect how? 2.6 casing into holes filling pile construction processes? After playing what problem should pay attention to?
1. The series: (1) the last penetration degrees: (2) heavy hammer low strike: (3) after playing: (4) concrete filling coefficient:
3. Masonry problem
Review thinking
What are the requirements of the bonding mortar 3.1? 3.2 brick masonry quality requirements? What are those? 3.3 this brick, stone masonry building of construction technology. 3.4 brick wall to answer the Cha in temporary discontinuous way which several? Have why to ask? 3.5 the main building blocks working procedure is??????? 3.6 masonry construction in winter of what problem should note? 3.7 laying use scaffolding are basic requirements of the??????? 3.8 brick wall in the form of group build by laying bricks or stones have? 1. The series:
(1) the number of skin stem: (2) bricklaying trinity method: freezing method (3), (4) mixed with salt mortar law:
Four. Reinforced concrete engineering
Review thinking
4.1 to the template have why to ask? Design template should consider those principles? 4.2 template design should consider what load? 4.3 influence factors of concrete side pressure have? 4.4 try for steel template of the characteristics and composition. 4.5 describe reinforced cold pull and cold pull control method. 4.6 the ability of the cold drawing equipment is how to determine the size? 4.7 what method of reinforced connection? How to choose in engineering? 4.8 how to calculate the length of reinforced materials? 4.9 describe the principles and methods of reinforced replacement? 4.10 this concrete construction process technology.
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。