英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

英国管理本科毕业论文 [16]

论文作者:www.51lunwen.org论文属性:本科毕业论文 Thesis登出时间:2015-06-03编辑:felicia点击率:30939

论文字数:15571论文编号:org201505262313039095语种:英语 English地区:英国价格:免费论文

关键词:

摘要:对于一个企业而言,工作中掌握良好的工作方法可以有效提高工作效率和工作质量,推动企业的发展。这篇文章就围绕工作方法进行具体阐述。

stopped 57 times due to insert failure in one particular shift alone while cutting the pocket, but still the pocket operation was not completed.


At the end of the first time study it was observed that the machine was stopped 180 times to complete the pocket operation. Each time the machine is stopped due to an insert failure there is a delay of about 3-4 minutes which includes checking the insert condition to flip or change the insert. On the whole the delay is about 4 hours in one particular shift when there is a pocket operation. To complete the entire pocket the machine was stopped 180 times due to the same problem which leads to a 12 hour delay and when added with the other delays in the operation such as waiting for paper work, and other unnecessary movement around the shop floor makes the total delay very worse for each and every part. Whenever this operation is performed there is usually confusion among the workers as the process does not follow the procedure or the standard program.


Whenever there is an insert failure the operator used to take his decision based on his experience to re run at the same depth of cut until the insert performs well till the end. As the skill set of the operators working in 2 such machines and on different shifts vary, each arguing their method to be superior and correct, lead to inconsistency or lack of standardized work procedure in the cell.


Based on the time study observation for this operation it is understood that the pocket is having an interrupted cut on a high strength inconel material which is causing this potential instability and delay in the process. Based on the input from the shop floor it was understood that the problem existed for a long time and most of the solutions which were tried either did not work or worked initially and the same problem started over again in a different way. This bottleneck process in the cell is very important for improving the cell throughput which eventually satisfies the product demand. To have a brief idea about the work piece, it has two holes running all along the part for a length of about 40 inches over the sides which are first drilled in the earlier operation and then a pocket is made in the middle of the 40 inch long part which cuts these two holes leading to an interrupted cut which is solely responsible for the delay and inconsistency.


As the time delay for every part in the system is more than 2 extra days an immediate solution was required for this problem. The tool insert company was contacted to get their potential views and solutions for the problem and to solve it faster with better grade inserts to prevent insert failure. The tool insert representative who came to have a look on this issue in the shop floor quoted that the insert which is currently used for the interrupted cut pocket operation was one of the best grade of inserts and he even quoted that if a different grade or type of insert could be used it could even worsen the problem, and there was no guarantee that it may improve the situation. With these inputs from the tool insert company it was decided to use the same tool insert.


As the first contact with the tool Insert Company did not help much in the work to reduce the cycle time to 论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。

英国英国 澳大利亚澳大利亚 美国美国 加拿大加拿大 新西兰新西兰 新加坡新加坡 香港香港 日本日本 韩国韩国 法国法国 德国德国 爱尔兰爱尔兰 瑞士瑞士 荷兰荷兰 俄罗斯俄罗斯 西班牙西班牙 马来西亚马来西亚 南非南非