lean manufacturing by providing achievable improvement in time-based activities and creditable estimated savings in resources.
Reference文献
Anderson, P. (1999) “Complexity theory and organization science”.Organization Science. 10(): 216-232
Andersson, R., Eriksson, H. and Torstensson, H. (2006) “Similarities and differences between
TQM, six sigma and lean”.The TQM Magazine. 18(3): 96-282
Andrei, B. and Filippov, A. () “From system dynamics and discrete event to practical agent based modeling: reasons, techniques, tools”.
Anupindi, R., Chopra, S., Deshmukh, S.D., Van Mieghem, J.A.,Zemel, E., 1999.Managing Business Process Flows. Upper SaddleRiver. Prentice Hall, NJ.
Anu Maria.(1997) “Introduction to modelling and simulation”.Proceedings of the 1997 Winter Simulation Conference.ed. S. Andradóttir, K. J. Healy, D. H. Withers, and B. L. Nelson.
Axelrod, R.(1997) “Advancing the art of simulation in the social sciences”.Santa Fe Institutepaper. 97(05): 48
Banks,J., J. Carson, B. Nelson, D. Nicol (2001). “Discrete-Event System Simulation”.Prentice Hall. New Jersey
BECA.(2013) “Auckland Airport Lean Six Sigma Improvements”.
Boaden, R. (1997) “What is total quality management. . .and does it matter?”.Total Quality
Management & Business Excellence.8(4):71-153
Brandao de Souza, L. (2009) “Trends and approaches in lean healthcare”.
Leadership inHealth Services. 22(2): 121–139
Brown, S., and K,Eisenhardt. (1998)“Competing on the Edge”.HarvardBusiness School Press.
Bwchinese. (2013). “How to face with the challenge in Chinese textile industry”
Chinanews. (2013) “the extensive economy needs to be changed”
Chao Heien Chu, Wei Ling Shih. (1992) “Simulation studies in JIT Production”.International Journal of Production Research. 30(11): 2573-2586
Cooper, R.G. (1993) “Winning at New Products”. (Reading, Massachusetts: Addison Wesley,
Damodar, Y.Golhar., Carol, L.Stamm. (1991) “The just-in-time philosophy: A literature review”. International Journal of Production Research. 29(4): 657-676
Detty, R. B. and Yingling, J. C. (2000) “Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study”.International Journal of Production Research. 38(2): 429-445
De Treville, S., Antonakis, J., (2006) “Could lean production job designbe intrinsically motivating?Contextual, configurational andlevels-of-analysis issue”.Journal of Operations Management. 24(2): 99-123
Dooley, K. (2002) “Simulation research methods”.Companion to organizations. Joel Baum (ed.), London: Blackwell.
Fawaz, A. Abdulmalek., Rajgopal, J. (2007)“Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study”.
Economics. 107(1): 223-236
Fernando Marin Martinez, Luis Miguel ArrecheBedia.(2002) “Modular simulation tool for modelling JIT manufacturing”.International Journal of Production Research. 40(7): 1529-1547
Forrester, J. (1961)Industrial Dynamics. Cambridge, MA: Productivity Press.
Gordon, G. (1961) A general purpose systems simulation program. McMillan NY, Proceedings of EJCC, Washington D.C., 87-104
Grunwald, H., Striekwold, P.E.T., Weeda, P.J. (1989) “A framework for quantitative comparison of production control concepts”.International Journal of Production Research.27(): 281-292
Gupta, A.,
本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。