英语论文网

留学生硕士论文 英国论文 日语论文 澳洲论文 Turnitin剽窃检测 英语论文发表 留学中国 欧美文学特区 论文寄售中心 论文翻译中心 我要定制

Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal

英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献

ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter

澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文

小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法

英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查

temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语

经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目

日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题

职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意

商务英语翻译论文广告英语商务英语商务英语教学

无忧论文网

联系方式

代写挪威留学生作业-通信工程课程作业communication assignment

论文作者:英语论文网论文属性:作业 Assignment登出时间:2012-01-24编辑:kalila点击率:7068

论文字数:6677论文编号:org201201241349029506语种:英语 English地区:挪威价格:免费论文

关键词:挪威留学生作业代写挪威通信工程作业communication assignmentNorway

摘要:挪威留学生作业-通信工程课程作业communication assignment Norway university. "Communication project budget estimate" examination

代写挪威留学生作业-通信工程课程作业communication assignment-  "Communication project budget estimate" examination
The first chapter of construction management and project cost
A, fills up the topic
1. The construction project is to point to by a general design for construction, the economic unified accounting, have independent administrative organization form, unified management of the construction unit.
2. Single project is to point to have separate design documents, after the completion of the independent production ability to play or benefit of the project.
3. The unit works "means has the independent design, can be independent construction of Engineering.
4. According to the nature of the construction project investment divided into basic construction projects and technology reconstruction project.
5. Large and medium-sized construction project is to point to more than 500 km in length across the province, area long distance communication cable, fiber optic cable, length is in of over 1000 km long distance communication across the province, area microwave, and total investment is in 50 million yuan of above of other basic construction project.
6. Technical renovation project is to point to limit the limit is in 50 million yuan of above technical reconstruction project.
7. Construction procedure is to point to construction projects from ideas, selection, evaluation, decision-making, design, construction and acceptance to put into production, the whole construction process, each work must follow the law of the order.
8. In our country, the general large and medium-sized and limitation above from the construction project prior to the construction of the construction work and put into production by project proposal, feasibility study, preliminary design, annual plan, preparation for construction, the construction drawing design, construction bidding, work-start reports, the construction, the preliminary acceptance, the test run, completion acceptance, delivery and use such links.
9. The main purpose of the feasibility study on the project is whether it is feasible in technology and economy is reasonable by scientific analysis and verification.
10 preliminary design is based on the feasibility study report of approval, and the relevant design standards, norms, and through the field survey for the design of get reliable based material after the establishment.
11. The construction bidding, sign a contract, the construction unit of the year in order to fund, equipment and material supply and engineering management organization, the construction project in before the start of a month, the construction units in conjunction with construction unit to the competent department of work-start reports put forward.
12. Design documents is to arrange for construction projects and construction of main basis, so design documents must be with engineering survey and design by the level of qualification certificate and the corresponding design of the unit.
13. Three stage design, preliminary design stage budget estimates compiled; Technology design of fixed estimate; Construction drawing design stage of construction drawing budget.
14. Construction drawing design documents are usually made of text, the drawings and budget of three parts.
15 project cost is to point to a construction project expected spending or all the fixed assets and actual expenses investment costs.
16. According to the engineering project, the classi论文英语论文网提供整理,提供论文代写英语论文代写代写论文代写英语论文代写留学生论文代写英文论文留学生论文代写相关核心关键词搜索。