Bussiness ManagementMBAstrategyHuman ResourceMarketingHospitalityE-commerceInternational Tradingproject managementmedia managementLogisticsFinanceAccountingadvertisingLawBusiness LawEducationEconomicsBusiness Reportbusiness planresearch proposal
英语论文题目英语教学英语论文商务英语英语论文格式商务英语翻译广告英语商务英语商务英语教学英语翻译论文英美文学英语语言学文化交流中西方文化差异英语论文范文英语论文开题报告初中英语教学英语论文文献综述英语论文参考文献
ResumeRecommendation LetterMotivation LetterPSapplication letterMBA essayBusiness Letteradmission letter Offer letter
澳大利亚论文英国论文加拿大论文芬兰论文瑞典论文澳洲论文新西兰论文法国论文香港论文挪威论文美国论文泰国论文马来西亚论文台湾论文新加坡论文荷兰论文南非论文西班牙论文爱尔兰论文
小学英语教学初中英语教学英语语法高中英语教学大学英语教学听力口语英语阅读英语词汇学英语素质教育英语教育毕业英语教学法
英语论文开题报告英语毕业论文写作指导英语论文写作笔记handbook英语论文提纲英语论文参考文献英语论文文献综述Research Proposal代写留学论文代写留学作业代写Essay论文英语摘要英语论文任务书英语论文格式专业名词turnitin抄袭检查
temcet听力雅思考试托福考试GMATGRE职称英语理工卫生职称英语综合职称英语职称英语
经贸英语论文题目旅游英语论文题目大学英语论文题目中学英语论文题目小学英语论文题目英语文学论文题目英语教学论文题目英语语言学论文题目委婉语论文题目商务英语论文题目最新英语论文题目英语翻译论文题目英语跨文化论文题目
日本文学日本语言学商务日语日本历史日本经济怎样写日语论文日语论文写作格式日语教学日本社会文化日语开题报告日语论文选题
职称英语理工完形填空历年试题模拟试题补全短文概括大意词汇指导阅读理解例题习题卫生职称英语词汇指导完形填空概括大意历年试题阅读理解补全短文模拟试题例题习题综合职称英语完形填空历年试题模拟试题例题习题词汇指导阅读理解补全短文概括大意
论文作者:英语论文论文属性:作业 Assignment登出时间:2014-04-03编辑:caribany点击率:7702
论文字数:1837论文编号:org201404031426228391语种:英语 English地区:英国价格:免费论文
关键词:Grid Assets电网资产Full-Cycle Cost Management全周期成本管理Grid construction
摘要:中国现在是电网建设,资产规模快速增长的高峰期,必须改变过去的管理模式,传统的电网成本管理模式只重视投资成本,不重视运行费用,因而很难适应电网发展的需求。
The grid assets full cycle cost management seminar
电网资产全周期成本管理研讨会
[Abstract] With the accelerated development of power Grid Construction, a huge grid assets, the traditional way of Asset Management has been unable to meet the development needs of the new situation, we must accelerate the transformation of management philosophy. This paper discusses a new management, co-ordination to deal with security, performance and cycle costs relationship between the three, to improve the efficiency of the use of the power grid assets, reduce total life cycle costs, the grid assets Lean, the entire process of comprehensive management.
[摘要]随着电网建设的加速发展,一个巨大的电网资产,资产管理的传统方式的加速发展已经无法适应新形势的发展需要,我们必须加快管理理念的转变。本文讨论了一种新的管理,协调处理安全性,性能和周期成本的关系这三者之间,提高了使用的电网资产的效率,降低全寿命周期成本,电网资产精益的整个综合治理的过程。
[Keywords] Grid Assets, Full-Cycle Cost Management.
[关键词]电网资产,全周期成本管理。
Grid construction, renovation, operation and maintenance tasks are even more onerous, traditional management approach, there's many problems, such as the short life of equipment, inefficient use of technological input, high maintenance costs gradually emerging. Cycle cost management, in essence, is the system Engineering theory in asset management.
电网建设,改造,运行和维护任务更加繁重,传统的管理方式,有很多问题,如寿命短的设备,使用效率低,技术投入,高维护成本等问题逐渐显现。周期成本管理,本质上是系统工程理论在管理资产。
Full-cycle cost management based on assets as a research object, starting from the overall goal of the system, and consider asset planning, design, procurement, construction, operation, maintenance, technical innovation, scrapped the whole process, to meet the security, performance under the premise pursuit of the asset life cycle cost optimal, and the scientific method to achieve system optimization.
Cost Management Is Relatively Weak.
Limitations of power construction project cost control project cost control is only concerned about the cost of the construction period. Existing cost control and more building owners, design side, the construction side, cost control, cost control object is the construction of the project construction period or a stage of the construction period.
Project cost control object is the project cost, not pay enough attention to the project running costs from the point of view of the life cycle, the equivalent of the cost of the construction phase control, cost control is less than the cost of the construction phase control.
Was caused by the other phases of the project cost control to consider the impact of the interaction between the various stages and the overall life cycle cost less fragmented internal relations of the various stages of the construction project cost which may cause certain stage of cost control effect increased costs, the higher cost of the entire life cycle of construction projects.
Grid assets cost management status quo. "Segmented" asset-based management, the various departments have different objectives, scope and focus of the various stages of management information can not be shared, the feedback evaluation mechanism is not perfect, the continuity of work is not effective enough, sufficiently sophisticated business process design, there are differences or conflicts between the systems, standards, lack of asset management, "the whole process of" assessment, pay more attention to the effectiveness of a 本论文由英语论文网提供整理,提供论文代写,英语论文代写,代写论文,代写英语论文,代写留学生论文,代写英文论文,留学生论文代写相关核心关键词搜索。